A rental make-ready is just a sequence, and the sequence is the whole game. Do the steps in the right order, repairs before paint, paint before flooring, cleaning last, and the whole turn moves in 4 to 7 days. Do them out of order and you repaint a wall you just dinged, or clean a floor before the installers track through it. Here is the checklist, in the order that keeps vacancy days low.

Step 1 — Walk-through and scope (Day 1)

  • Photograph every room for the move-out condition record
  • Note damage vs. wear and tear for the deposit (how to tell them apart in Tennessee)
  • Build the punch list: everything broken, missing, or worn
  • Decide the tier: refresh, standard turn, or full make-ready

Step 2 — Repairs and punch list (Days 1–2)

  • Drywall patches, nail holes, and any wall damage
  • Doors, locks, handles, and cabinet hardware
  • Plumbing: faucets, toilets, shut-off valves, supply lines
  • Electrical: outlets, switches, light fixtures, smoke and CO detectors
  • HVAC filter swap and a quick system check
  • Caulk and grout in kitchens and baths

Repairs come first because everything after this covers them up.

Step 3 — Paint (Days 2–3)

  • Touch up scuffs and marks, or full repaint if needed
  • Prime any stains or patched drywall first
  • Use one standard portfolio color so future turns are touch-ups, not repaints
  • Paint before flooring so drips do not land on new floors

Step 4 — Flooring (Day 3–4)

  • Clean carpet, or replace if stains or matting will not come out
  • Install LVP if upgrading, it outlasts carpet across several tenants
  • Replace worn transition strips and baseboards

Step 5 — Deep clean (Day 4–5)

  • Full move-out clean: kitchens, baths, floors, baseboards, fixtures
  • Appliance deep clean inside and out
  • Windows, blinds, and light bulbs (replace any dead ones)
  • Cleaning goes last so no trade tracks through a clean unit

Step 6 — Curb appeal and final inspection (Day 5–7)

  • Mow, edge, trim, and clear beds; pressure wash if needed
  • Final walk-through against this checklist
  • Move-in condition photos for the next tenant's baseline
  • Confirm it is listing-ready and shoot listing photos

The reason turns drag is not the work, it is the gaps between contractors. One crew running this sequence back to back is what turns a three-week vacancy into a one-week one, and on an $1,800 rental that is roughly $840 in saved rent. See what a turnover actually costs in Nashville.

The bottom line

Work the list in order, keep one crew moving through it, and a make-ready stays fast and predictable. Upkeep runs packaged make-readies across Middle Tennessee on exactly this sequence, with a flat quote before the unit is vacant. One service request gets it scheduled.